When installing concrete pump source to test concrete. If it is concrete, mix and feed trucks, conveyor wear pump tube may be installed, as long as we can to facilitate the takeover and feed. If a live mix and concrete, first to determine the mix as well as the location of the machine according to the site as well as the way the material mix and machines, according to Discharge height mix and machines as well as for wear pump tube feeding and taking over the requirements to determine the location of the concrete pump.
1. First, the concrete pump is placed on a solid concrete floor or pier, keeping the four legs of locating pins and safety pins locking degree and pumps, making tires tires off the ground or removed.
2. make a chute according to the discharge port and tubing wear and mix hopper and machine, so mix and machine discharged into the hopper feed pump through the chute.
3. usually chute angle as skeleton, welded steel with 1.5mm thick. Set up under the chute with support to make it secure.
4. Typically the environment on the hopper wear pump tube machine needs heightening about 20cm, so hopper volume increase, in order to ensure the concrete will not drain. Because compulsory unloading best mix and machine once emptied, so the flow of concrete into the hopper than the force of symmetry. If the sub-sub-discharge, the last ones out of the concrete stones, for pumping unlucky, especially large concrete slump, it should be noted, so the hopper pump to heightening. If it is a large volume of mix and machine, you can do a hopper in advance, in order to ensure continuous supply.
5. Place the chute, requires proper slope, thanks to the tilt angle between the 25 ° -40 °, the gap is not too large.
6. chute connected to the pump hopper, chute and hopper want to leave some space for easy cleaning and hopper sieve.
7. Once in place, look at the whole, to ensure delivery pipe casing wear resistant pipe door switch freely, easy maintenance operations.